Rock House NEW 6-Bed 6 Bath Pool 5-min to Beach by Bocobay | Apartment in Eagle Beach

| 10.0 (1 Review) |   6 Bedrooms  6 Bathrooms  12 Guests
Opal Apartment | Rock House NEW 6-Bed 6 Bath Pool 5-min to Beach by Bocobay

6 Bedroom Apartment in Opal, Eagle Beach

Spacious Accommodations

Rock House NEW 6-Bed 6 Bath Pool 5-min to Beach by Bocobay in Palm-Eagle Beach offers a spacious apartment with six bedrooms and six bathrooms. The terrace and outdoor swimming pool provide relaxing spaces.

Modern Amenities

Guests enjoy free WiFi, air-conditioning, and a fully equipped kitchen with a dishwasher and microwave. Additional amenities include a washing machine, dining area, and private pool.

Convenient Location

Located less than 0.6 mi from Hadicurari, the property is 6.2 mi from Queen Beatrix International Airport. Nearby attractions include Tierra del Sol Golf Course (4.3 mi), Hooiberg Mountain (6.8 mi), and Arikok National Park (12 mi). Scuba diving is available in the surroundings.

Rock House NEW 6-Bed 6 Bath Pool 5-min to Beach by Bocobay is located in Eagle Beach.

This 6 Bedrooms Apartment is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Air Conditioner, Parking, Pool, and several others. This is a 4 star rated property and has over 1 review with the average score of 10 . Coming to Eagle Beach and needing a place to stay? Be it for work or for leisure, consider staying at this Apartment for your next visit, you will surely love it.

You can check the reviews and description of this 6 Bedrooms Apartment if you want to learn more about this place in Eagle Beach. These details are authentic, as they are provided by our partner, booking.com.

This Rock House NEW 6-Bed 6 Bath Pool 5-min to Beach by Bocobay in Eagle Beach is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “Rock House NEW 6-Bed 6 Bath Pool 5-min to Beach by Bocobay”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Apartment, please let us know.

Show more

Amenities

Air Conditioner
Parking
Pool
Balcony/Terrace
Security/Safety
Child Friendly
Internet

Facility Overview

Parking
  • Free parking
  • Parking on site
  • Parking
  • Private Parking
General
  • Air conditioning
  • Smoke-free property
  • Wifi in all areas
Internet
  • Free Wifi
  • Wifi
  • Internet
Outdoors
  • Terrace
  • Outdoor pool
Spa
  • Swimming pool

Policies

Check-in
The minimum age for check-in is 18
Cancellation policy
Free cancellation
Payment Policy
Credit card required
Pet Policy
Pets are not allowed

This property does not accommodate bachelor(ette) or similar parties.

Reviews

Marcale
Apr 21, 2026 07:00:00 AM
Review Score:   10
USA
Reviewer Type: Extended Group
Travel Purpose: leisure
Positive: I enjoyed the decor and design; it felt luxurious, and the pool was fantastic with various photo spots around the house.
Negative: N/A
Summary: The owner made all requests easy to access and provided them right away. Communication was excellent, and the service ha
See All Reviews

Room Arrangement

Room Info Facilities
Villa with Private Pool
Room Type: Villa
Room Size: 410 m2
2 Twin bed(s) Bed
1 King bed(s) Bed
1 King bed(s) Bed
1 King bed(s) Bed
1 King bed(s) Bed
1 King bed(s) Bed
Villa with Private Pool

Bathroom

Towels, Hairdryer, Toilet paper, Shower, Private bathroom, Bathtub or shower, Towels/Sheets (extra fee), Toilet

General

Air conditioning, Tile/Marble floor, Iron, Carbon monoxide sources, Smoke Alarm, Carbon monoxide detector, Safe, Private entrance, Fire extinguisher, Trash cans

Media & Technology

Flat-screen TV, TV, Telephone, Streaming service (like Netflix)

Kitchen

Electric kettle, Wine glasses, Refrigerator, Dryer, Stovetop, Toaster, Oven, Dishwasher, Kitchenware, Dining table, Washing machine, Kitchen, Microwave, Cleaning products

Living Area

Sofa, Desk, Dining area, Sitting area

Outdoors

Private pool, Patio, Terrace

Bedroom

Wardrobe or closet

Room amenities

Feather pillow, Socket near the bed, Drying rack for clothing

Pool and Spa

Pool towels

Food & Drink

Bottle of water

FAQ's

Is this Opal apartment pet-friendly for guests?

No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.

What time is check-in & check-out at Opal apartment?

Check-in time for Opal apartment starts counting from 4:00 PM and check-out is until 10:00 AM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Does the Opal apartment have a swimming pool?

Yes, this Opal apartment has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in Opal apartment?

Best-rates for the Opal apartment starts from $1,511 per night with includes Internet, Air Conditioner, Parking, Pool, Balcony/Terrace, Security/Safety, Child Friendly with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.

Is Opal apartment a family-friendly place to stay?

Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this apartment 4 stars or guests have recommended them suitable for families. As reported by the owner or manager, the apartment has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the Opal apartment wheelchair accessible or offer services for disabled guests?

Based on the information received from our partner, the Opal apartment has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the Opal apartment?

Based on the information reported by the owner or manager, the Opal apartment indicates 1 day stay policy at this apartment. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for Opal apartment?

Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Check Apartment Availability
Nightly rates from:
USD1,511
You will be redirected to  
Hot Deal - It has been viewed 50 times today
Not the right fit? Check out our other properties in Opal
Bon Bini Studio From US $125
         

9.4 (9 Reviews)
House
  • Air Conditioner
  • Parking
  • Pet Friendly
Wariruri 209 From US $161
         

|
10.0 (2 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • View
Luxury 2BR Palm Beach Condo| Aracari 25 by Bocobay From US $314
         

10.0 (3 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pool
La Boheme Aruba From US $85
         

|
9.0 (6 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pool
Luxury 2BR Condo w/Balcony | Aracari 18 by Bocobay From US $271
         

10.0 (3 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pool
Condosinaruba From US $91
         

New
Apartment
  • Air Conditioner
  • Parking
  • Pool
5 min to the Beach | Happy Aruba Villa by Bocobay From US $683
         

10.0 (2 Reviews)
Villa
  • Air Conditioner
  • Parking
  • Pool
Opal 126 From US $314
         

New
Villa
  • Air Conditioner
  • Parking
  • Pool
Lux 2BR Palm Beach Condo | Aracari 14 by Bocobay From US $328
         

9.6 (5 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pool
The Golden Shell From US $109
         

9.0 (2 Reviews)
House
  • Air Conditioner
  • Parking
  • Pet Friendly
Charming Condo in Prime Location @ Wacamaya Condos From US $225
         

8.8 (3 Reviews)
Condo
  • Air Conditioner
  • Parking
  • Pool
LOOK NO FURTHER.Make This Your Own Private Paradise Getaway! From US $420
         

Great rates awarded Aruba’s gold seal, Wacamaya From US $133
         

9.6 (52 Reviews)
Condo
  • Air Conditioner
  • Parking
  • Pool
WINTER SPECIAL $ 100 night , 5 ⭐️Walk To Ritz & Marriott hotels & Palm beac From US $75
         

Upscale Mediterranean Villa Great location! From US $862
         

9.8 (69 Reviews)
Villa
  • Air Conditioner
  • Parking
  • Pool
OJ88 - Private Villa with pool - Close to Palm Beach From US $470
         

10.0 (2 Reviews)
Villa
  • Air Conditioner
  • Parking
  • Pool